Petition of Maharashtra Veej Grahak Sanghatana seeking changes in Tariff Schedule
including consumption by small commercial activities run in residential premises in to
Residential Category.
|
|
|
56 of 2011
(INTERIM ORDER)
|
In the matter of
Petition filed by M/s. Lloyds Metals & Energy Ltd. under Section 62 (1) (a) & Section 86 (1)
(e) of the EA 2003, for determination of tariff for supply of electricity from Industrial waste
heat recovery co-generation power plant of capacity 30 MW at Ghugus, Dist. Chandrapur of
Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation
for electricity produced from waste heat recovery based co-generation plants.
|
|
|
|
|
|
|
|
In the matter of
Complaint filed by Shri Ram Ramprasad Rathi, Proprietor, Red Brick Company against MSEDCL, under Sections 43, 142 and 149 of Electricity Act, 2003, alleging non-compliance of an Order dated 10.08.2010 passed by the CGRF, Amravati Zone, in regard to the release of supply and the refund of the infrastructure cost.
|
|
|
|
In the matter of
The Maharashtra State Power Generation Company Limited?s (MSPGCL) Petition for
determination of final Tariff and approval of ARR for FY 2010-11 for Paras Unit No. 4
& Parli Unit No. 7.
|
|
|
|
In the matter of
Application of 21st Century Infrastructure (India) Private Limited
for grant of Trading Licence in accordance with the
MERC (Trading Licence Conditions) Regulations, 2004
TRADING LICENCE NO. 3 OF 2011 |
|
|
|
In the matter of
Petition for seeking review of the methodology of FAC calculation for MSPGCL?s
stations in line with section 62 (4) of Electricity Act 2003.
|
|
|
130 of 2011 and 131 of 2011
|
In the matter of
Petition filed by Godrej Properties & Investment Limited and Godrej Castlemaine
under Sections 86 and 94 of the Electricity Act, 2003 seeking Clarification of the Tariff
Order dated August 17, 2009 in Case No. 116 of 2008.
|
|
|
|
In the matter of
Petition filed by M/s Ispat Industries Ltd. for clarification of Commission?s Order dated 01.03.2011 in Case No. 44 of 2010.
|
|
|
|
In the matter of
Petition of Indo Rama Synthetics (India) Ltd for penalizing MSEDCL for contravening the provisions of MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations 2005 for not sanctioning standby demand and for violating the Commission?s Order in Case No. 83 of 2010 by not sanctioning Open Access for purchase of power through Power Exchange.
|
|
|
|
In the matter of Petition filed by JSW Energy Limited under Section 86(1)(f) of the Electricity Act, 2003 regarding levy of Clean Energy Cess and Counter Veiling Duty on import of coal as notified by the Ministry of Finance, affecting its power purchase agreement with MSEDCL
|
|
|
|
In the matter of
Complaint filed by MEC Engineers, against MSEDCL under Sections 142 and 146 of the Electricity Act, 2003 for non-compliance of CGRF Order dated 3rd January,
2011.
|
|
|
|
In the matter of
Complaint by Raj Laboratories against MSEDCL under Sections 142 and 146 of the Electricity Act, 2003 for non-compliance of CGRF Order dated 3rd January, 2011.
|
|
|
|
In the matter of
Petition filed by Reliance Infrastructure Limited (RInfra-D) seeking Clarification on various issues related to MERC (Renewable Purchase Obligations, its compliance and Implementation of REC framework) Regulations, 2010.
|
|
|
|
In the matter of
Complaint by Bhakti Industries, against MSEDCL, under Sections 142 and 146 of the Electricity Act, 2003, alleging non-compliance of the CGRF Kalyan Order dated 15th December 2010.
|
|
|
|
In the matter of
Complaint by Jay Vijay Plastics, against MSEDCL, under Sections 142 and 146 of the Electricity Act, 2003, for non-compliance of the CGRF Kalyan Order dated 24th December, 2010.
|
|
|
|
In the matter of
Complaint by Bhakti Industries, against MSEDCL, under Sections 142 and 146 of the Electricity Act, 2003, alleging non-compliance of the CGRF Kalyan Order dated 15th December 2010.
|
|
|
|
In the matter of
Complaint by Simplex Plast against MSEDCL under Sections 142 and 146 of Electricity Act, 2003 for non-compliance of the CGRF Order dated 09th December, 2010.
|
|
|
|
In the matter of
Permission for filing Annual Revenue Requirement and determination of tariff for FY 2011-12 for BEST Undertaking under MERC (Terms & Conditions of Tariff) Regualtions, 2005
|
|
|
|
In the matter of
Petition for Review of an Order dated 30th March 2011 (Case No. 103 of 2010) in the matter of approval of the Addendum to the Power Purchase Agreement dated 1st April 2009 signed between MSPGCL & MSEDCL.
|
|
|
|
In the matter of
Complaint filed by Shri Sanjay Ankush Nikam against MSEDCL for non-compliance
of CGRF?s (Kolhapur Zone) Order dated 29th Oct. 2010.
|
|
|
|
In the matter of
Complaint by Mahendra Industrial Mfg. Co. against MSEDCL under Sections 142 and 146 of the Electricity Act 2003 for non-compliance of CGRF Order dated 15th December, 2010.
|
|
|
|
In the matter of
Complaint by Ashirwad Plastics, against MSEDCL under Sections 142 and 146 of the Electricity Act, 2003 for non-compliance of CGRF order dated 27th September, 2010.
|
|
|
|
In the matter of
Complaint by Allied Plast, against MSEDCL under Sections 142 and 146 of the Electricity Act, 2003, for non-compliance of CGRF Order dated 9th December, 2010.
|
|
|
|
In the matter of
Petition filed by Jain Irrigation Systems Limited under Regulations 24, 85(a), 92 and 95 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, seeking review of the Commission?s Order dated August 17, 2009 passed in Case No. 116 of 2008.
|
|
|
|
In the matter of
Petition of MSEDCL for non- compliance of the Order dated 27.01.2011 passed by the Commission in Case No. 85 of 2010 and 87 of 2010.
|
|
|
|
In the matter of
Petition of Shree Renuka Sugars Ltd. seeking reimbursement of expenses from MSEDCL/ MSETCL incurred towards creation of evacuation infrastructure for its Bagasse based co-generation project of 30 MW capacity in the State of Maharashtra
on BOOT basis
|
|
|
|
In the matter of
Petition under Section 67 of the E.A. 2003 against the Maharashtra State Electricity Transmission Company Ltd., for obtaining mandatory permission of the land owner at the time of erection of 220 KV Mhaisal ? Jath Line.
|
|
|
|
In the matter of
Complaint filed by Vivek Polymer India under Sections 142 and 146 of the EA, 2003 for non-compliance of CGRF Order dated February 17, 2011 by MSEDCL
|
|
|
|
In the matter of
Petition of M/s.JSW Energy Ltd. for adjudication of dispute between JSW Energy Ltd. and Maharashtra State Electricity Distribution Company Ltd.
|
|
|
|
In the matter of
Complaint filed by M/s Veetek Plastics against MSEDCL under Sections 142 and 146 of Electricity Act, 2003 for non-compliance of the Order dated 02.12.2010 of CGRF, Kalyan Zone.
|
|
|
|
In the matter of
Complaint by M/s D.D. Polyplast Pvt. Ltd. against MSEDCL under Sections 142
and 146 of the Electricity Act 2003 for non-compliance of CGRF Order dated
8th September, 2010.
|
|
|
|
In the matter of
Petition of M/s JSW Green Energy Ltd seeking tariff approval of Solar Rooftop Photo Voltaic Project under Section 61, 62, 86 & 181 of the EA, 2003 & Regulation 7 of the MERC (Terms & Conditions for determination of RE Tariff) Regulations, 2010 by JSW Green Energy Ltd. as the Generating Utility.
|
|
|
|
In the matter of
Complaint filed by Shri Ashok Susuruddin Nadaf against MSEDCL under Section 142 of the Electricity Act 2003 alleging non-compliance of the Order dated 20th April, 2011 of CGRF, Kolhapur Zone.
|
|
|
|
In the matter of
Maharashtra State Electricity Transmission Company Ltd?s (MSETCL) Petition
seeking exemption under the first proviso to Regulation 4.1 of MERC (Multi Year
Tariff) Regulations, 2011 and certain amendments thereto.
|
|
|
|
In the matter of
Approval of the PPA between TPC-G and TPC-D.
|
|
|
|
Complaint filed by M/s Gimatex Industries Pvt. Ltd., Hinganghat, Dist. Wardha, against MSEDCL under Sections 142 and 146 of E.A., 2003, alleging non-compliance of the Order dated 6th Oct., 2010, passed by the Electricity Ombudsman.
|
|
|
|
Complaint filed by M/s Gimatex Industries Pvt. Ltd., Wani, Dist. Wardha, against MSEDCL, under Sections 142 and 146 of E.A., 2003, alleging non-compliance of the Order dated 6th Oct., 2010, passed by the Electricity Ombudsman.
|
|
|
Case No. 100 of 2011, MA No. 4 of 2011 and Case No. 143 of 2011
|
In the matter of Petition of MSEDCL seeking Final True up for the FY 2009 ? 10, Provisional True Up for the FY 2010 -11 and Annual Performance Review for the FY 2010-11
|
|
|
|
In the matter of
Petitions seeking clarification of Order dated November 24, 2003 in Case No. 17 (3), 3,4,5 of 2002 passed by the Commission.
|
|
|
|
In the matter of
Application of Maharashtra State Electricity Distribution Company Limited for withdrawal of load shedding of Divisions A, B, C, D groups of Other Region area
|
|
|
|
In the matter of
Application of Maharashtra State Electricity Distribution Company Limited for continuation of Zero Load Shedding in the Headquarters of Revenue Division
of MSEDCL Licence Area
|
|
|
|
In the matter of
Petition filed by M/s Navlakha Translines under Section 42 (3) of the Electricity Act 2003 and Regulations 3 and 18(2) of the MERC (Distribution Open Access) Regulations, 2005 and Regulations 92-94 of the MERC (Conduct of Business) Regulations, 2004 in the matter of adjudication of dispute regarding
provisions of Non discriminatory Open Access
|
|
|
|
In the matter of
Complaint filed by Kaygaon Paper Mills Ltd., against MSEDCL, under Section 142 read with section 62 (6) of the Electricity Act, 2003, alleging non-compliance of the CGRF, Aurangabad Order dated 30th September, 2010, in the matter of refund of infrastructure costs.
|
|
|
|
In the matter of
Application of Maharashtra State Electricity Distribution Company Limited for Review of Order dated November 30, 2009 in Case 31 of 2009.
|
|
|
|
In the matter of
Petition seeking legal action under Section 129(1), 142 and 146 of the Electricity Act 2003 (EA 2003) for arbitrary levy of two part tariff and wrongful categorization of low tension consumer in the Commission Orders.
|
|
|
|
In the matter of
Implementation of the Judgment dated 11th July, 2011 rendered by the Hon?ble APTEL in Appeal Nos. 156 of 2010 and 155 of 2010.
|
|
|
|
In the matter of
Reliance Infrastructure Limited?s (RInfra) Petition for ?in principle? approval for Medium Term Power Procurement under Section 86 (1) (b) of the Electricity Act, 2003
|
|
|
|
In the matter of
Maharashtra State Power Generation Company Ltd?s (MSPGCL) Petition in regard to Annual Performance Review for the year 2010-11 & determination of tariff and approval of Aggregate Revenue Requirement (ARR) for the year 2011-12
|
|
|
|
In the matter of
Petition under Section 67 of the E.A, 2003 seeking directions upon MSETCL in regard to erection of Tower.
|
|
|
|
In the matter of
Petition of Maharashtra State Power Generation Co Ltd seeking review of direction given during the hearing held on 21st July, 2011 on a Petition for Project Cost Determination and Tariff Determination in respect of Parli Unit 7 and Paras Unit 4.
|
|
|
|
In the matter of
Complaint filed by Shri Vithoba Moglappa Pogul against Maharashtra State Electricity Distribution Company Ltd., under Section 142 of Electricity Act, 2003, alleging non-compliance of the Order No. 239-2010/1511 dated 14.12.2010, passed by the CGRF Kolhapur Zone.
|
|
|
|
In the matter of
BEST?s Petition for review of Order dated May 5, 2011 in Case No. 43 of 2011 regarding deferment of implementation of MERC (Multi Year Tariff) Regulations, 2011
|
|
|
|
In the matter of
Petition filed by Maharashtra State Electricity Distribution Company Limited regarding Cross Subsidy Surcharge and Stand by Charges for Open Access consumers
And
In the matter of
De novo re-determination of Cross Subsidy Surcharge and issues related to Open Access.
|
|
|
|
In the matter of
Maharashtra State Electricity Distribution Company Limited?s (MSEDCL) Petition seeking review of Commission?s Suo-Motu Order dated May 30, 2011 in Case No. 23 of 2010. |
|
|
|
In the matter of
Complaint filed by Shri Santu Sambhaji Khandekar, against MSEDCL, under Section 142 of the Electricity Act, 2003, alleging non-compliance of the Order dated 31st December, 2010, passed by the CGRF, Kolhapur Zone, in the matter of delay in providing electricity connection. |
|
|
|
In the matter of
Complaint filed by Kipril Products & Packagings Pvt. Ltd., against Maharashtra State Electricity Distribution Company Ltd., under Sections 142 and 146 of Electricity Act, 2003, alleging part non-compliance of the Order dated 13.10.2010, passed by the CGRF, Kalyan Zone, in the matter of refund of ASD.
|
|
|
|
In the matter of
Complaint filed by M/s Accurate Plastics Co., against Maharashtra State Electricity Distribution Company Ltd., under Sections 142 and 146 of Electricity Act, 2003, alleging non-compliance of the Order dated 29.09.2010, passed by the CGRF, Kalyan Zone, in the matter of refund of SD, ASD and RLC. |
|
|
|
In the matter of
Petition of The Tata Power Co. Ltd. seeking direction upon MSETCL to grant connectivity to 60.48 kWp Rooftop Solar Power Project at Tata Power?s Carnac Receiving Station. |
|
|
|
In the matter of
Application of M/s. Knowledge Infrastructure Systems Pvt Ltd for grant of Trading Licence in accordance with the
MERC (Trading License Conditions) Regulations, 2004.
TRADING LICENCE NO. 2 OF 2011 dated September 2, 2011 |
|
|
|
In the matter of
RInfra?s Petition for deferment of the implementation of the MERC (Multi Year Tariff) Regulations, 2011. |
|
|
|
In the matter of
Petition of Tata Power Company seeking clarifications with respect to EoI for distribution of electricity in the RInfra area of supply
|
|
|
|
In the matter of
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under Regulation 27 of the MERC(CGRF & EO) Regulations, 2006, for relaxation from constitution of Consumer Grievance Redressal Forums at the newly created three (3) Zones, at Jalgaon, Nanded & Baramati. |
|
|
|
In the matter of Petition filed by MSEDCL seeking stay of Order dated June 02, 2011 in Case No. 31 of 2011. |
|
|
|
In the matter of
Petition filed by M/s R.L. Steel and Energy Ltd. for Non compliance of Order
passed by the Commission dated 02.06.2011 in Case No. 31 of 2011. |
|
|
|
In the matter of
Maharashtra State Power Generation Company Ltd?s (MSPGCL) Petition for deferment of implementation of MYT Regulations 2011. |
|
|
|
In the matter of
Maharashtra State Electricity Distribution Company Ltd?s (MSEDCL) Petition for deferment of implementation of MYT Regulations, 2011. |
|
|
|
In the matter of
Complaint filed by Shri Damji Samji Patel against MSEDCL, under Sections 142, 146 and 149 of Electricity Act, 2003, alleging non-compliance of the Order dated 06.12.2010, passed by the CGRF, Amravati Zone, in regard to infrastructure cost of switching over supply from Agricultural Feeder to Gaothan Feeder. |
|
|
|
In the matter of
Application of Reliance Infrastructure Limited (RInfra) for grant of Transmission Licence under the provisions of Section 14 read with Section 15 of Electricity Act, 2003.
TRANSMISSION LICENCE NO. 1 OF 2011 dated August 11, 2011
|
|
|
|
In the matter of
Application of Lanco Infratech Limited for grant of Distribution Licence in the area of supply served by RInfra-D in the State of Maharashtra. |
|
|
|
In the matter of
Application of Torrent Power Limited for grant of Distribution Licence in the South Zone of RInfra-D area. |
|
|
|
In the matter of
Application of Maharashtra State Electricity Distribution Company Limited for grant of Distribution Licence in the area of supply served by RInfra-D. |
|
|
|
In the matter of
Application of Indiabulls Power Limited for grant of Distribution Licence in the area of supply served by R-Infra-D in the Suburbs of Mumbai. |
|
|
|
In the matter of
Application of Reliance Infrastructure Limited for grant of Distribution Licence in and around suburbs of Mumbai inclusive of area covered under Chene and Varsova which are contiguous with Applicant?s existing area of licence.
DISTRIBUTION LICENCE NO. 1 OF 2011 dated August 11, 2011 |
|
|
|
IN THE MATTER OF
Reliance Infrastructure Ltd. Distribution Business? (RInfra-D) Petition for Truing Up for FY 2008-09, Annual Performance Review for FY 2009-10 and Tariff Determination for FY 2010-11.
|
|
|
|
IN THE MATTER OF
Maharashtra State Electricity Transmission Company Ltd?s (MSETCL) Petition for approval of Aggregate Revenue Requirement for FY 2011-12, Annual Performance Review for FY 2010-11 and Truing up for FY 2009-10.
|
|
|
|
In the matter of
Implementation of Hon?ble Appellate Tribunal for Electricity?s Judgment dated 24th May, 2011 in Appeal No. 99 of 2010 ? MSPGCL v/s MERC & Ors.
|
|
|
|
In the matter of
Implementation of Hon?ble Appellate Tribunal for Electricity?s Judgment dated 27th April, 2011 in Appeal No. 72 of 2010 ? MSPGCL v/s MERC & Ors.
|
|
|
|
In the matter of
Implementation of Hon?ble Appellate Tribunal for Electricity?s Judgment dated 27th April, 2011 in Appeal No. 191 of 2009 ? MSPGCL v/s MERC & Ors.
|
|
|
|
In the matter of
Maharashtra State Electricity Distribution Company Ltd.?s (MSEDCL) Petition for Approval of deviations taken in Request for Proposal and Power Purchase Agreement from Standard Bidding Documents issued by Ministry of Power for procurement of 600 MW (+ 10%) base load power on long term basis through tariff based Competitive Bidding Process (Case 1).
|
|
|
|
In the matter of
Petition filed by M/s Abhijeet MADC Nagpur Energy Private Ltd., seeking clarification of the Order dated 12th September,2010 in Case No. 111 of 2009 in respect of MSEDCL?s Annual Performance Review (APR) for FY 2009-2010, True up for FY 2008-2009 and ARR and Tariff Determination for FY 2010-2011 regarding applicability of Tariff Category for Startup Power connection of Power Plant.
|
|
|
|
In the matter of
Petition filed by Maharashtra State Electricity Distribution Company Ltd (MSEDCL) seeking approval for Energy Purchase Agreement between MSEDCL and NTPC for Purchase of wind energy as per CERC Order dated 09.11.2010 and CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009.
|
|
|
|
In the matter of
Petition filed by Reliance Infrastructure Limited (RInfra) for adoption of Tariff determined through transparent process of bidding under section 63 of the Electricity Act, 2003 in respect of power purchase agreement entered into between Reliance Infrastructure Limited and Wardha Power Company Ltd. (WPCL).
|
|
|
|
In the matter of
Petition filed by Reliance Infrastructure Limited for adoption of tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 in respect of Power Purchase Agreement entered into between Reliance Infrastructure Limited on the one hand and Abhijeet MADC Nagpur Energy Pvt. Ltd.
|
|
|
|
In the matter of
Petition of The Tata Power Company Ltd. for Approval of Additional/Revised Norms in MERC MYT Regulations, 2011.
|
|
|
|
In the matter of
Petition filed by Maharashtra State Power Generation Company Limited seeking review of Order dated 13th April 2011 (Case No. 107 of 2009) of the Commission in the matter of Approval of Truing up for FY 2007-08 and FY 2008-09 for Parli Unit 6 and Truing up of Paras Unit 3, Annual Performance Review for FY 2009-10 and Determination of Tariff for FY 2010-11 for Parli Unit-6 and Paras Unit-3.
|
|
|
|
In the matter of
Petition for applicability extension and request for continuation of Billing to MSEDCL in the Financial Year 2011-12 for energy sale from Parli Unit 6 & Paras Unit 3 of MAHAGENCO in respect of the Order dated 13th April, 2011 in MERC Case No. 107 of 2009 under the Regulation 100 of the MERC (Multi Year Tariff), Regulations, 2011.
|
|
|
|
In the matter of
Petition filed by The Bombay Dyeing & Mfg. Co. Ltd., Patalganga under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004, seeking review of the Order dated 23.12.2010 in Case no. 114 of 2009.
|
|
|
|
In the matter of
Complaint filed by M/s Shivam Oil Industries, Barshi Takli, Akola, against MSEDCL, under Sections 142 and 149 of the Electricity Act, 2003, alleging non-compliance of the Order dated 12th October, 2010, passed by the CGRF, Amravati Zone, and seeking refund of infrastructure cost and excessive charges.
|
|
|
|
In the matter of
Petition filed by Shri Deepak Shankarlal Agrawal, Akola, under Section 142 of the EA, 2003, and Regulations 8.7 & 22 of MERC(Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006, alleging non-compliance of Order dated 13th October, 2010, passed by CGRF, Amravati Zone, in the matter of seeking refund of infrastructure cost and excessive charges.
|
|
|
|
In the matter of
Complaint filed by Shyam Oil Mill, Akot, Akola, against MSEDCL, under Sections 142 and 149 of the Electricity Act, 2003, alleging non-compliance of the Order dated 13th October, 2010, passed by the CGRF, Amravati Zone, in the matter of seeking refund of infrastructure cost and excessive charges.
|
|
|
|
In the matter of
Complaint filed by Shri Sanjay Bhagwan Gondhali, against MSEDCL, under Section
142 of the Electricity Act, 2003, alleging non-compliance of the Order dated
11th March, 2010, passed by the CGRF, Kolhapur Zone, in the matter of delay in
providing services to the Consumer.
|
|
|
|
In the matter of
Petition filed by M/s. R. L. Steels and Energy Ltd seeking action against MSEDCL for non-compliance of the Commission?s direction regarding levy of Voltage Surcharge in its Order dated 09.11.2010 in Case No.52 of 2010.
|
|
|
|
In the matter of
Petition of M/s. Wardha Power Company Limited for quashing of letter dated March 30, 2010 issued by Maharashtra State Electricity Transmission Company Limited demanding transmission charges.
|
|
|
|
In the matter of
Petition of M/s. Abhijeet MADC Nagpur Energy Pvt. Ltd. regarding request for adoption of tariff and approval of power purchase agreement for 55 MW of power under Case 1 bidding with Reliance Infrastructure Limited.
|
|
|
|
In the matter of
Petition filed by Reliance Infrastructure Ltd. for Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 in respect of Power Purchase Agreement (PPA) entered into between Reliance Infrastructure Limited and Vidharbha Industries Power Limited respectively.
|
|
|
|
In the matter of
Petition filed by M/s. Wardha Power Company Ltd. seeking for adoption of Tariff and approval of Power Purchase Agreement dated June 4, 2010 for 260 MW of power pursuant to Case-1 Bidding procedure through Tariff based Competitive Bidding process initiated by M/s. Reliance Infrastructure Ltd. in terms of Request of Proposal for Medium Term issued on July 30, 2009
and
Dispute between a Generating Company and Distribution Licensee as a result of the deliberate and willful failure of the Distribution Licensee to seek statutory adoption of tariff and approval of Power Purchase Agreement within a reasonable timeframe so as to enable supply of power from April 1, 2011 in terms of the Power Purchase Agreement dated June 4, 2010
|
|
|
|
In the matter of
Petition filed by Shri Ankush Sitaram Gayakwad, under Section 142 of the EA 2003 and Regulation 22 of MERC(CGRF and EO) Regulations, 2006, against MSEDCL, alleging non-compliance of the Order dated 28th October 2010, passed by the CGRF, Kolhapur Zone
|
|
|
|
Suo Motu hearing for action to be initiated against Maharashtra State Electricity Distribution Co Ltd for non-adherence of Load Shedding Protocol approved by the Commission.
|
|
|
|
In the matter of
Petition of M/s JSW Energy (Ratnagiri) Limited for adjudication of disputes with Maharashtra State Electricity Distribution Company Limited
|
|
|
|
In the matter of
Petition of M/s. JSW Energy Limited seeking adjudication of dispute with Maharashtra State Electricity Distribution Company Limited arising from a Power Purchase Agreement dated 23rd day of February, 2010
|
|
|
|
In the matter of
Petition filed by the Jaigad Power Transco Limited (JPTL)
for approval of Aggregate Revenue Requirement for FY 2010-11
|
|
|
|
In the matter of
Petition filed by M/s. Kay Power and Paper Ltd., for Grant of Interim Unit Rate
for Bagasse Based Co-generation Project
|
|
|
|
In the matter of
Petition filed by M/s. DLI Power (India) Pvt. Ltd., seeking clarification from Suo-Motu Order dated July 14, 2010 in Case No. 20 of 2010 regarding Determination of Generic Tariff under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.
|
|
|
|
In the matter of
Maharashtra State Electricity Distribution Company Ltd.?s (MSEDCL) Petition for adoption of Tariff and approval of reduction in requisitioned capacity to 1000 MW for Medium Term Power Procurement under Case I Bidding
|
|
|
|
In the matter of
Maharashtra State Electricity Distribution Company Ltd.?s (MSEDCL) Petition
for approval of Power Purchase Agreement (PPA) with M/s. Adani Power Maharashtra Ltd. (APML) for 125 MW long term power procurement and adoption of tariff
|
|
|
|
In the matter of
Supply of Electricity from the generating stations of the Tata Power Company Ltd. to Reliance Infrastructure Ltd. for distribution to its consumers.
|
|
|
|
In the matter of
Petition of Reliance Infrastructure Ltd seeking adoption of tariff under Section 63 of the Electricity Act, 2003 in respect of Power Purchase Agreement entered into between Reliance Infrastructure Limited and Chitrangi Power Private Limited
|
|
|
|
In the matter of
Petition of Reliance Infrastructure Limited seeking review of Order dated January 27, 2011 passed by the Commission in Case No.53 of 2010
|
|
|
|
In the matter of
Petition of the Tata Power Co. Ltd to seek approval of the proposed quantum of Power for Medium term power procurement through Competitive bidding process under Case 1 bidding and Bidding documents in accordance with Section 63 of the Electricity Act, 2003 and Competitive Bidding Guidelines
|
|
|
|
In the matter of
Petition of Maharashtra Veej Grahak Sanghatna for initiating penal action against MSEDCL?s Officers for implementing excessive load shedding on single phase & Separate Agricultural Pumps electricity users, by violating the MERC?s load shedding guidelines and Methodology.
|
|
|
|
IN THE MATTER OF
Petition of M/s. Reliance Infrastructure Limited and M/s. Reliance Power Transmission Limited seeking extension/renewal of Transmission Licence under the provisions of the Electricity Act, 2003
|
|
|
|
In the matter of
BEST's Petition for deferment of the implementation of the MERC (Multi Year Tariff) Regulations, 2011
|
|
|
|
In the matter of
Application of M/s. NTS Power for grant of licence in accordance with the
MERC (Trading License Conditions) Regulations, 2004
TRADING LICENCE NO. 1 OF 2011 dated May 4, 2011 |
|
|
|
In the matter of Determination of Generic Tariff for the second
year of the first Control Period under Regulation 8 of the Maharashtra
Electricity Regulatory Commission (Terms and Conditions for Determination
of Renewable Energy Tariff) Regulations, 2010 |
|
|
11 & 42 of 2011 |
( INTERIM ORDER ) |
|
In the matter of Petition filed by M/s. Wardha Power Company Ltd. seeking for
adoption of Tariff and approval of Power Purchase Agreement dated June 4, 2010
for 260 MW of power under Section 63, 86 (1) (b) and 86 (1) (f) of the Electricity
Act, 2003 pursuant to Case ? 1 Bidding Procedure through Tariff Based
Competitive Bidding process initiated by M/s. Reliance Infrastructure Limited in
terms of Request of Proposal for Medium Term issued on July 30, 2009 and
Dispute between a Generating Company and Distribution Licensee as a result of
the deliberate and willful failure of the Distribution Licensee to seek statutory
adoption of tariff and approval of Power Purchase Agreement within a reasonable
timeframe so as to enable supply of power from April 1, 2011 in terms of the
Power Purchase Agreement dated June 4, 2010. ( Case 11 0f 2011 )
&
In the matter of M/s. Abhijeet MADC Nagpur Energy Pvt. Ltd. Petition for the
adoption of Tariff and approval of Power Purchase Agreement dated 04.08.2010
for 55 MW of Power under Sec 63 and 86 (1) (b) of the Electricity Act, 2003
pursuant to Case 1 Bidding Procedure through Tariff Based Competitive Bidding
Process initiated by Reliance Infrastructure Limited in terms of Request for
Proposal for Medium Term issued on July 30, 2009 and Dispute between a
generating Company and the distribution Licensee as a result of the deliberate and
willful failure to comply with the terms and conditions of the PPA by Reliance
Infrastructure Limited
( Case 42 0f 2011 ) |
|
|
|
IN THE MATTER OF Petition filed by The Maharashtra State
Power Generating Company Limited (MSPGCL) for approval of Truing up
for FY 2007-08 and FY 2008-09 for Parli Unit 6 and Truing up of Paras
Unit 3, Annual Performance Review for FY 2009-10 and Determination
of Tariff for FY 2010-11 for Parli Unit 6 and Paras Unit 3.
( Case 107 of 2009 ) |
|
|
|
In the matter of Review of Order dated 06.05.2008 passed in Case
No. 93 of 2007 and for appropriate directions to the Respondent
under Section 10(2) of the Electricity Act, 2003 and the Terms of
EPA dated 25.10.2004. |
|
|
|
In the matter of Petition under Section 67 (4) of the E.A, 2003,
challenging the Notice issued by Maharashtra State Electricity Transmission
Co. Ltd. (MSETCL) under Indian Telegraph Act, 1885 for erection
of 400 KV Koradi - Wardha Line. |
|
|
|
In the matter of Petition of M/s Reliance Infrastructure Limited
seeking extension/renewal of Distribution Licence for its Mumbai
Licence Area for 25 Years. |
|
|
|
In the matter of Complaint filed by M/s Pace Investment Pvt., Ltd.,
seeking directions against MSEDCL under Section 142 and Section
149 of the Electricity Act, 2003 for non-compliance of the Order
passed by the IGR Cell, Pune, dated 14.09.2010. |
|
|
|
In the matter of Order dated September 12, 2010 in Case No. 102
of 2009 regarding approval of APR for the year 2009-10 and for determination
of tariff and approval of ARR for the year 2010-11 of MSPGCL. |
|
|
|
In the matter of The Tata Power Company Ltd. Distribution Business'
(TPC-D) Petition for approval of additional Power Purchase during
Quarter 4 of FY 2010-11. |
|
|
|
In the matter of Petition filed by MSETCL for approval of MSLDC
Budget for FY 2011-12. |
|
|
|
In the matter of blatant misuse of the electricity bills issued
by Reliance Infrastructure Ltd. (RInfra) to its consumers, &
abuse of the billing process to disparage & malign the Petitioner. |
|
|
|
In the matter of Petition of Mula Pravara Electric Cooperative
Society Ltd. for violation of provisions relating to grant of Open
Access. |
|
|
|
In the matter of Application of M/s. Adani Power Maharashtra Limited
for amendment of "Transmission Licence for Adani Power Maharashtra
Limited (Licence No. 2 of 2009)"
Amendment
to Transmission Licence No. 2 of 2009 dated July 6, 2009
|
|
|
|
In the matter of Petition of MSETCL for consideration of the additional
Employee Expenses for grant of ex-gratia to their employees for
the FY 2009-2010. |
|
|
|
In the matter of Complaint filed by M/s. Godrej Properties &
Investment Ltd. and M/s Castlemaine Premises Co-operative Society
Ltd., seeking directions upon Maharashtra State Electricity Distribution
Company Ltd under Sections 142 and 149 of Electricity Act, 2003
alleging non-compliance of tariff orders passed by MERC, dated and/or
made applicable from 10th March 2004, 1st June 2008 and 1st August
2009. |
|
|
|
In the matter of Petition of MSPGCL for consideration of the additional
Employee Expenses for grant of ex-gratia to their employees for
the FY 2009-2010. |
|
|
|
In the matter of Complaint filed by Shri Rajesh Narnaware under
Sections 142 and 149 of the Electricity Act, 2003, for violation
of Govt. Notification 06/06/2005 and M.E.R.C. Order dated. 27/09/2006
respectively. |
|
|
|
In the matter of Petition filed by Shri Santosh Lunkaranji Chandak,
Proprietor, Chandak Constructions, seeking compliance of CGRF's
Order dated 13th October, 2010, by MSEDCL and penal action under
Sections 142 and 149 of the Electricity Act, 2003, in the matter
of refund of infrastructure cost. |
|
|
|
In the matter of Petition seeking approval of the Addendum to the
Power Purchase Agreements dated 01.04.2009 signed between MSEDCL
and MSPGCL. |
|
|
|
In the matter of Review Petition filed by BEST for Recovery of
Power Factor Incentive paid to consumers during FY 2007-08 and FY
2008-09 amounting to (i) Rs.26.14 Crore for FY 2007-08, and (ii)
Rs.44.23 Crore for FY 2008-09. |
|
|
|
In the matter of Petition of M/s. Wardha Power Company Limited
for grant of transmission capacity rights for evacuation of 270
MW (second phase) of power from the Petitioners generating substation
at Warora through MSETCL's existing 220kV Warora Substation. |
|
|
|
In the matter of Complaint filed by M/s Shyam Pulses against MSEDCL,
under Sections 142 and 149 of the Electricity Act, 2003, alleging
non-compliance of the Order dated 11.10.2010, passed by the CGRF,
Amravati Zone, in matter of refund of infrastructure cost and the
transformer testing charges. |
|
|
83 of 2010 |
In the matter of Petition of M/s Indo Rama Synthetics (India) Ltd.,
against MSEDCL for not providing open access to purchase 10 MW power
from IEX.
|
1-March-2011 |
|
44 of 2010 |
In the matter of Petition filed by M/s. Ispat Industries Ltd. against
MSEDCL seeking direction for implementation of the judgment of Hon'ble
APTEL dated 05.08.2010 passed in Appeal Nos. 70 and 110 of 2008.
|
1-March-2011 |
|
89 of 2010 |
In the matter of Petition filed by M/s. Kay Power and Paper Ltd.,
for Grant of Interim Unit Rate for Bagasse Based Co-generation Project. |
|
|
76 of 2010 |
In the matter of Maharashtra State Electricity Distribution Company
Ltd. (MSEDCL)'s Petition for determination of Additional Supply
Charge for withdrawal of Load Shedding in the Headquarters of Revenue
Divisions in MSEDCL Licence Area. (Case No. 31 of 2009)
In the matter of Extension of applicability of Order in the matter
of MSEDCL's Petition for determination of Additional Supply Charges
for withdrawal of Load Shedding in the Headquarters of Revenue Divisions
in MSEDCL Licence Area in Case No. 31 of 2009. (Case No. 76 of 2010)
|
24-Feb-2011 |
|
110 of 2010 |
Petition filed by Maharashtra State Electricity Distribution Company
Ltd (MSEDCL) seeking deferment of payment to MSETCL as per tariff
revised vide order dated 10th September 2010 in Case No. 120 of
2009.
|
23-Feb-2011 |
|
|
In the matter of Petition of Shri Nanasaheb Punjabi Pawar &
Ors. seeking directions to the Respondent No. 1 for following the
load shedding protocol in terms of Order dated November 28, 2008
in Case Nos. 77 and 78 of 2008 and for setting aside the load shedding
schedule issued by the Respondent No. 1 to the Petitioner vide its
letter dated 06.10.2010. |
|
|
REMOVAL OF DIFFICULTY ORDER
|
In The Matter Of Removal of Difficulty in Implementing the Maharashtra
Electricity Regulatory Commission (Multi Year Tariff) Regulations,
2011. |
|
|
100 & 101 of 2010 |
In the matter of Petitions filed by Akot MIDC Industries Association
and MRVGS regarding refund of ORC/DDF and such other charges which
are not as per the MERC (Electricity Supply Code) Regulations, 2005
and not approved under the Scheduled of Charges.
|
18-Feb-2011 |
|
|
In the matter of Petition of MSEDCL for consideration of the additional
employee expenses for grant of ex-gratia to their employees for
the year 2009-2010. |
|
|
|
In the matter of Petition of MSEDCL for withdrawal of load shedding
for Villages within 5 kms area around Major Generating Power Stations
in Maharashtra. |
|
|
|
In the matter of Petition of M/s. Tata Power Company Limited for
connectivity of 3MW of Solar based power generation project to the
grid. |
|
|
|
In the matter of Petitions seeking clarification of Order dated
November 24, 2003 in Case No. 17 (3), 3,4,5 of 2002 passed by the
Commission. |
|
|
|
In the matter of MSEDCL's Application for grant of Distribution
Licence for MPECS Area of Supply [Case 85 of 2010] & Mula
Pravara's Application for grant of Distribution Licence for MPECS
Area of Supply [Case No. 87 of 2010] |
|
|
|
In the matter of Petition filed by M/s. Wardha Power Company Limited
in the matter of adjudication of dispute against Reliance Infrastructure
for Request for Proposal for procurement of Power for "Long term"
under Case-1 Bidding Procedure through tariff based Competitive
Bidding Process issued in July 2009 |
|
|
|
In the matter of Determination of Fees and Charges payable under
Regulation 9.7 of Maharashtra Electricity Regulatory Commission
(Renewable Purchase Obligation, its Compliance and Implementation
of REC framework) Regulations, 2010. |
|
|
|
In the matter of Complaint filed by Shri Santosh Vasantrao Maisne
against MSEDCL, under Sections 43, 142 and 149 of Electricity Act,
2003, alleging non-compliance of the Order dated 18th October 2010
passed by the CGRF, Amravati Zone, in regard to release of supply. |
|
|
28 of 2010 |
( INTERIM ORDER ) |
|
In the matter of Petition of M/s. Wardha Power Company Limited
for grant of transmission capacity rights for evacuation of 270
MW (second phase) of power from the Petitioners generating substation
at Warora through MSETCL's existing 220kV Warora Substation. |
|